Initial hardware install of Sage 15/SageCat electrical system

The initial hardware install of the Sage 15/SageCat prototype electrical system is complete –

initial install of parts

What you are seeing –

  • top left is the 12V ports, both ‘socket style’ and USB.
  • bottom left is the battery master.
  • bottom right is the charger extension cord hookup.
  • far right is the cooling vent for the battery charger. the charger is attached to this 1/2-bulkhead inside the starboard v-berth locker.

Now to install the wiring …